Skip to product information
1 of 1

K'NEX

K'NEX Battery Motor with Long Lead

K'NEX Battery Motor with Long Lead

Regular price €15,00 EUR
Regular price Sale price €15,00 EUR
Sale Sold out
Taxes included. Shipping calculated at checkout.

Low stock: 3 left

Quantity

Original K'NEX electric motor connected to a battery pack via a long wire lead. Requires 2x AA batteries (not included). Inspected and tested working. 

View full details